Commercial Real Estate Pro Network
BIGGEST RISK with Bryan Roberts
- Author: Vários
- Narrator: Vários
- Publisher: Podcast
- Duration: 0:01:47
- More information
Informações:
Synopsis
J Darrin Gross I'd like to ask you, Brian Roberts, what is the BIGGEST RISK? Bryan Roberts Yeah, of course, the biggest risk, one of the biggest risks, I would say, for geothermal HVAC systems is late integration into the project. If a developer brings us in after the mechanical engineering the MEP is finalized or or even well underway, we're. Often trying to retrofit a solution into a system that wasn't designed to support it. There can, at times, be a little bit of a knowledge gap. Many architects and engineers will default to legacy HVAC systems simply because that's what they're most familiar with. And we see some missed opportunities because geothermal wasn't on the table early enough. So I would say it's really important that we get involved in the conversation early. That's that's a huge risk for us to not be involved early enough. On the flip side, if, if I look at it from the developers perspective, those developers who don't go with geothermal, their risk is future obsolescence. You're looking wit